New construction, Palm Beach County
Quick answer

The city file for 109 SE 5th Avenue in downtown Delray Beach is a Level 3 site plan for four stories and 26 units, two and three bedrooms, 1,800 to 2,900 square feet, in two buildings joined by a pedestrian bridge. The Planning and Zoning Board approved it 7-0 on January 26, 2026. Details as of Nov. 12, 2026, from the city file.

Call or text Brian: 561-201-4717 Book a new construction consultation

Key facts (as of November 2026)

ConceptWhat was publishedSourceAs-of
Project109 SE 5th Avenue, downtown Delray Beach. Official city file 2024-104 / legislation file 26-0092. A four-story, approximately 98,000-square-foot, 26-unit multi-family residential development, including interior garage area.City of Delray Beach Planning and Zoning Board agenda and staff report, January 26, 2026Staff report and agenda in the official record; read November 12, 2026
Address and parcel109 SE 5th Avenue. PCN 12-43-46-16-F1-000-0010. Official staff report: 0.89 acres, 38,860 sq ft. The applicant narrative places the property “between Southeast 5th and Southeast 6th Avenues.” Land use: Commercial Core (CC). Zoning: Central Business District (CBD), Central Core.Official staff report and applicant project narrative filed with the CityJanuary 26, 2026 record; read November 12, 2026
ResidencesOfficial staff report: 26 units, a mix of 2-bedrooms and 3-bedrooms, ranging in size between 1,800 and 2,900 square feet. Two separate buildings connected by a pedestrian bridge over a private alley. Proposed density 29 dwelling units per acre (maximum allowed 30). Maximum allowed FAR: 3.0.Official staff reportJanuary 26, 2026 record
Amenities in official filingsApplicant narrative: “an amenity deck and rooftop terrace,” “a fitness center, lobby and other amenities,” a 945-square-foot forecourt, landscaped area 19.90% of the 38,860-square-foot site, and a bridge on levels two through five (roof). Staff report: “A rooftop amenity deck with pool is proposed on the roof of the western building”; primary lobby; interior parking, with the west building including two floors of parking; trash and loading in the east building from the interior alley; civic space at the NE and NW corners, with the required civic space as an urban plaza at the NW corner. Those are official-record descriptions, not a published sales brochure.Official narrative, staff report, and unfinalized minutesJanuary 26, 2026 record
ParkingOfficial staff table: CBD parking required 57 spaces (1.75 per unit \= 46; 0.5 guest per unit \= 10; 0.3 guest per unit after 21 units \= 1.80; total required 57). Provided: 59 (40 standard / 17 compact / 2 ADA). Bicycle: Type I required 3, provided 3; Type II required 5, provided 7. Required parking is in enclosed garages screened from the primary streets. Sole vehicle access is from the interior alley; existing curb cuts on 5th Avenue and 6th Avenue are removed.Official staff reportJanuary 26, 2026 record
Tenure / pricingOfficial staff report: “The residential units are proposed as market rate, and no workforce housing component is included.” Official city records describe a multi-family residential development. They do not print a for-sale condominium offering, a rental program, a from-price, a deposit schedule, an HOA dollar, or a completion year. Pricing is not published.January 26, 2026 record; read November 12, 2026
Existing buildingApplicant narrative: a two-story commercial building “which used to be home to a PNC bank.” Staff report: “an approximately 11,000 square foot commercial office building in the Mediterranean Revival architectural style that previously included a financial institution and was constructed in 2002.” Existing FAR 0.29.Official narrative and staff reportJanuary 26, 2026 record
ArchitectureApplicant narrative: “The architecture and design are rooted in Modern Masonry style.” Staff report: Masonry Modern, a CBD Design Guidelines style that required case-by-case City Commission approval. Staff background: the applicant first requested “Contemporary Functionalism”; in April 2025 the Planning and Zoning Board recommended that alternative style; in June 2025 the City Commission did not approve it and instead approved Masonry Modern. Staff still criticizes the execution (glass-to-wall ratio; tripartite composition). No waivers are requested.Official narrative and staff reportJanuary 26, 2026 and the 2025 style action described in that report

Comparing your options? New construction buyer guide or book a 15-minute call. You'll also get our monthly Buyer Edition. Unsubscribe anytime.

Price and incentive snapshot (November 12, 2026)

Price itemAmountSourceMonth
Official from-priceNone published on an official developer page or in the official city site-plan file.November 12, 2026
Cash incentive, closing-cost credit, or rateNone published.SameNovember 12, 2026
HOA, condo association, or CDD dollarNone published.SameNovember 12, 2026
Deposit scheduleNone published.SameNovember 12, 2026
Completion yearNone published in the official city file.November 12, 2026
“Market rate”Official staff wording only. Not a price and not a tenure claim.Official staff reportJanuary 26, 2026 record

Before you visit the model

Register with your own agent first. It costs you nothing extra and it has to happen before your first visit to the sales office.

Call or text Brian: 561-201-4717 Book a new construction consultation

What residence facts are actually official?

Twenty-six units, two and three bedrooms, 1,800 to 2,900 square feet, in two buildings joined by a pedestrian bridge over a private alley, on 0.89 acres at 109 SE 5th Avenue, between SE 5th and SE 6th Avenues.

Proposed density is 29 dwelling units per acre against a maximum of 30. The staff Site Data block prints a proposed floor-area ratio of 2.52; the staff analysis later says “2.5 FAR.” The maximum allowed is 3.0. Existing FAR is 0.29. Waivers are not requested.

What did the Planning and Zoning Board actually do?

On January 26, 2026, the Board approved the Level 3 site plan, including architectural elevations and a landscape plan, 7-0, finding it consistent with the Land Development Regulations and the Comprehensive Plan.

Are unit-by-unit floor plans published?

The official file includes architectural plans as an attachment.

A buyer who wants a specific residence’s layout needs the owner’s current documents, reviewed against the official 1,800-to-2,900-square-foot range and the official two- and three-bedroom mix.

Brian Wilder's take

On November 12 I would walk a buyer through the filed plan: two buildings, a bridge over the alley and a 7-0 board vote in minutes not yet final. Call me and we will read it together, and I will not call it a finished offering plan.

Frequently asked questions

What residence facts are official?

The staff report shows 26 units, two and three bedrooms, 1,800 to 2,900 square feet, in two buildings joined by a pedestrian bridge over a private alley, on 0.89 acres.

What did the Planning and Zoning Board do?

On January 26, 2026 it approved the Level 3 site plan, including elevations and a landscape plan, 7-0. The minutes file is marked not final.

How large is the site?

The staff report gives 0.89 acres, or 38,860 square feet, with 19.90% landscaped area.

Are unit-by-unit floor plans published?

The file includes architectural plans as an attachment, but no unit-by-unit room table in text. Ask the developer for current documents.

Selling your current home too?

Start with what your home is worth today: free home value.

Talk it through before you visit the sales office

The sales team at the model works for the builder. I work for you. Call or text me before your first visit so you are registered with your own agent. Wilder Real Estate Group, Keller Williams Realty.

Call or text Brian: 561-201-4717 Book a new construction consultation Get the buyer guide What is my home worth? New construction buyer guide

You'll also get our monthly Buyer Edition. Unsubscribe anytime.

More on this community

Own a home in Delray Beach near 109 SE 5th Avenue?

Book a seller call or use the valuation page.

Get the seller guide

Details as of November 12, 2026, from the builder's site: delraybeach.legistar.com.