109 SE 5th Avenue is a proposed four-story, 26-unit residential building in downtown Delray Beach's Central Business District, between SE 5th and SE 6th Avenues. The city file, read November 12, 2026, lists no price and no measured walk to Atlantic Avenue. If you want the downtown setting, I will walk the block with you.
Key facts (as of November 2026)
| Concept | What was published | Source | As-of |
|---|---|---|---|
| Project | 109 SE 5th Avenue, downtown Delray Beach. Official city file 2024-104 / legislation file 26-0092. A four-story, approximately 98,000-square-foot, 26-unit multi-family residential development, including interior garage area. | City of Delray Beach Planning and Zoning Board agenda and staff report, January 26, 2026 | Staff report and agenda in the official record; read November 12, 2026 |
| Address and parcel | 109 SE 5th Avenue. PCN 12-43-46-16-F1-000-0010. Official staff report: 0.89 acres, 38,860 sq ft. The applicant narrative places the property “between Southeast 5th and Southeast 6th Avenues.” Land use: Commercial Core (CC). Zoning: Central Business District (CBD), Central Core. | Official staff report and applicant project narrative filed with the City | January 26, 2026 record; read November 12, 2026 |
| Residences | Official staff report: 26 units, a mix of 2-bedrooms and 3-bedrooms, ranging in size between 1,800 and 2,900 square feet. Two separate buildings connected by a pedestrian bridge over a private alley. Proposed density 29 dwelling units per acre (maximum allowed 30). Maximum allowed FAR: 3.0. | Official staff report | January 26, 2026 record |
| Amenities in official filings | Applicant narrative: “an amenity deck and rooftop terrace,” “a fitness center, lobby and other amenities,” a 945-square-foot forecourt, landscaped area 19.90% of the 38,860-square-foot site, and a bridge on levels two through five (roof). Staff report: “A rooftop amenity deck with pool is proposed on the roof of the western building”; primary lobby; interior parking, with the west building including two floors of parking; trash and loading in the east building from the interior alley; civic space at the NE and NW corners, with the required civic space as an urban plaza at the NW corner. Those are official-record descriptions, not a published sales brochure. | Official narrative, staff report, and unfinalized minutes | January 26, 2026 record |
| Parking | Official staff table: CBD parking required 57 spaces (1.75 per unit \= 46; 0.5 guest per unit \= 10; 0.3 guest per unit after 21 units \= 1.80; total required 57). Provided: 59 (40 standard / 17 compact / 2 ADA). Bicycle: Type I required 3, provided 3; Type II required 5, provided 7. Required parking is in enclosed garages screened from the primary streets. Sole vehicle access is from the interior alley; existing curb cuts on 5th Avenue and 6th Avenue are removed. | Official staff report | January 26, 2026 record |
| Tenure / pricing | Official staff report: “The residential units are proposed as market rate, and no workforce housing component is included.” Official city records describe a multi-family residential development. They do not print a for-sale condominium offering, a rental program, a from-price, a deposit schedule, an HOA dollar, or a completion year. Pricing is not published. | January 26, 2026 record; read November 12, 2026 | |
| Existing building | Applicant narrative: a two-story commercial building “which used to be home to a PNC bank.” Staff report: “an approximately 11,000 square foot commercial office building in the Mediterranean Revival architectural style that previously included a financial institution and was constructed in 2002.” Existing FAR 0.29. | Official narrative and staff report | January 26, 2026 record |
| Architecture | Applicant narrative: “The architecture and design are rooted in Modern Masonry style.” Staff report: Masonry Modern, a CBD Design Guidelines style that required case-by-case City Commission approval. Staff background: the applicant first requested “Contemporary Functionalism”; in April 2025 the Planning and Zoning Board recommended that alternative style; in June 2025 the City Commission did not approve it and instead approved Masonry Modern. Staff still criticizes the execution (glass-to-wall ratio; tripartite composition). No waivers are requested. | Official narrative and staff report | January 26, 2026 and the 2025 style action described in that report |
Comparing your options? New construction buyer guide or book a 15-minute call. You'll also get our monthly Buyer Edition. Unsubscribe anytime.
Price and incentive snapshot (November 12, 2026)
| Price item | Amount | Source | Month |
|---|---|---|---|
| Official from-price | None published on an official developer page or in the official city site-plan file. | November 12, 2026 | |
| Cash incentive, closing-cost credit, or rate | None published. | Same | November 12, 2026 |
| HOA, condo association, or CDD dollar | None published. | Same | November 12, 2026 |
| Deposit schedule | None published. | Same | November 12, 2026 |
| Completion year | None published in the official city file. | November 12, 2026 | |
| “Market rate” | Official staff wording only. Not a price and not a tenure claim. | Official staff report | January 26, 2026 record |
Before you visit the model
Register with your own agent first. It costs you nothing extra and it has to happen before your first visit to the sales office.
Call or text Brian: 561-201-4717 Book a new construction consultationWhere does the official file actually place the project?
At 109 SE 5th Avenue, PCN 12-43-46-16-F1-000-0010, 0.89 acres between Southeast 5th and Southeast 6th Avenues, in the Central Business District, Central Core, with Commercial Core land use. Adjacent zoning is CBD, Central Core in all directions.
Staff describes primary-street frontages and the removal of existing curb cuts on 5th Avenue and 6th Avenue so that those streets can function as pedestrian environments.
What official language describes the downtown character?
Staff: compact, pedestrian-oriented growth at a historic moderate downtown scale. Narrative: the project will create pedestrian and bicycle opportunities and redevelop “a very un-friendly pedestrian and bicycle environment,” consistent with Comprehensive Plan language about the Commercial Core.
Architecture is officially Masonry Modern, a CBD Design Guidelines style. Staff notes that the City Commission, in June 2025, approved that style after declining Contemporary Functionalism. Staff still questions the glass-to-wall ratio and the tripartite composition. Those are official design comments about a downtown building, not a lifestyle slogan.
Does the official file give a distance to Atlantic Avenue or the beach?
No measured walk-time or block count to Atlantic Avenue or to the beach is printed in the staff report or the applicant narrative used here.
A buyer who wants a precise walk should walk it.
Brian Wilder's take
On November 12 I would tell a buyer that this is a four-story building in the Central Business District, described in the city's own walkable-core language. I would rather walk the block with you than guess at a time to the Avenue.
Frequently asked questions
Is 109 SE 5th Avenue a high-rise?
The city file describes a four-story building.
Is the project on Atlantic Avenue?
The address is 109 SE 5th Avenue, between SE 5th and SE 6th Avenues. The city file prints no measured distance to Atlantic Avenue.
Is a price published for 109 SE 5th Avenue?
No. The city file lists no from-price, HOA dollar, deposit schedule or completion year. Double-check with the developer before you rely on any number.
Has the city approved the project?
On January 26, 2026 the Planning and Zoning Board approved the Level 3 site plan 7-0, in minutes not yet final.
Selling your current home too?
Start with what your home is worth today: free home value.
Talk it through before you visit the sales office
The sales team at the model works for the builder. I work for you. Call or text me before your first visit so you are registered with your own agent. Wilder Real Estate Group, Keller Williams Realty.
Call or text Brian: 561-201-4717 Book a new construction consultation Get the buyer guide What is my home worth? New construction buyer guideYou'll also get our monthly Buyer Edition. Unsubscribe anytime.
More on this community
- 109 SE 5th Avenue amenities and parking
- 109 SE 5th Avenue new vs resale
- 109 SE 5th Avenue site plan guide
Own a home in Delray Beach near 109 SE 5th Avenue?
Book a seller call or use the valuation page.
Details as of November 12, 2026, from the builder's site: delraybeach.legistar.com.