New construction, Palm Beach County
Quick answer

109 SE 5th Avenue is a proposed four-story, 26-unit building in downtown Delray Beach, on a site that has an office building constructed in 2002. The city file, read November 12, 2026, shows units of 1,800 to 2,900 square feet and no published price, so there is no price to set against a resale.

Call or text Brian: 561-201-4717 Book a new construction consultation

Key facts (as of November 2026)

ConceptWhat was publishedSourceAs-of
Project109 SE 5th Avenue, downtown Delray Beach. Official city file 2024-104 / legislation file 26-0092. A four-story, approximately 98,000-square-foot, 26-unit multi-family residential development, including interior garage area.City of Delray Beach Planning and Zoning Board agenda and staff report, January 26, 2026Staff report and agenda in the official record; read November 12, 2026
Address and parcel109 SE 5th Avenue. PCN 12-43-46-16-F1-000-0010. Official staff report: 0.89 acres, 38,860 sq ft. The applicant narrative places the property “between Southeast 5th and Southeast 6th Avenues.” Land use: Commercial Core (CC). Zoning: Central Business District (CBD), Central Core.Official staff report and applicant project narrative filed with the CityJanuary 26, 2026 record; read November 12, 2026
ResidencesOfficial staff report: 26 units, a mix of 2-bedrooms and 3-bedrooms, ranging in size between 1,800 and 2,900 square feet. Two separate buildings connected by a pedestrian bridge over a private alley. Proposed density 29 dwelling units per acre (maximum allowed 30). Maximum allowed FAR: 3.0.Official staff reportJanuary 26, 2026 record
Amenities in official filingsApplicant narrative: “an amenity deck and rooftop terrace,” “a fitness center, lobby and other amenities,” a 945-square-foot forecourt, landscaped area 19.90% of the 38,860-square-foot site, and a bridge on levels two through five (roof). Staff report: “A rooftop amenity deck with pool is proposed on the roof of the western building”; primary lobby; interior parking, with the west building including two floors of parking; trash and loading in the east building from the interior alley; civic space at the NE and NW corners, with the required civic space as an urban plaza at the NW corner. Those are official-record descriptions, not a published sales brochure.Official narrative, staff report, and unfinalized minutesJanuary 26, 2026 record
ParkingOfficial staff table: CBD parking required 57 spaces (1.75 per unit \= 46; 0.5 guest per unit \= 10; 0.3 guest per unit after 21 units \= 1.80; total required 57). Provided: 59 (40 standard / 17 compact / 2 ADA). Bicycle: Type I required 3, provided 3; Type II required 5, provided 7. Required parking is in enclosed garages screened from the primary streets. Sole vehicle access is from the interior alley; existing curb cuts on 5th Avenue and 6th Avenue are removed.Official staff reportJanuary 26, 2026 record
Tenure / pricingOfficial staff report: “The residential units are proposed as market rate, and no workforce housing component is included.” Official city records describe a multi-family residential development. They do not print a for-sale condominium offering, a rental program, a from-price, a deposit schedule, an HOA dollar, or a completion year. Pricing is not published.January 26, 2026 record; read November 12, 2026
Existing buildingApplicant narrative: a two-story commercial building “which used to be home to a PNC bank.” Staff report: “an approximately 11,000 square foot commercial office building in the Mediterranean Revival architectural style that previously included a financial institution and was constructed in 2002.” Existing FAR 0.29.Official narrative and staff reportJanuary 26, 2026 record
ArchitectureApplicant narrative: “The architecture and design are rooted in Modern Masonry style.” Staff report: Masonry Modern, a CBD Design Guidelines style that required case-by-case City Commission approval. Staff background: the applicant first requested “Contemporary Functionalism”; in April 2025 the Planning and Zoning Board recommended that alternative style; in June 2025 the City Commission did not approve it and instead approved Masonry Modern. Staff still criticizes the execution (glass-to-wall ratio; tripartite composition). No waivers are requested.Official narrative and staff reportJanuary 26, 2026 and the 2025 style action described in that report

Comparing your options? New construction buyer guide or book a 15-minute call. You'll also get our monthly Buyer Edition. Unsubscribe anytime.

Price and incentive snapshot (November 12, 2026)

Price itemAmountSourceMonth
Official from-priceNone published on an official developer page or in the official city site-plan file.November 12, 2026
Cash incentive, closing-cost credit, or rateNone published.SameNovember 12, 2026
HOA, condo association, or CDD dollarNone published.SameNovember 12, 2026
Deposit scheduleNone published.SameNovember 12, 2026
Completion yearNone published in the official city file.November 12, 2026
“Market rate”Official staff wording only. Not a price and not a tenure claim.Official staff reportJanuary 26, 2026 record

Before you visit the model

Register with your own agent first. It costs you nothing extra and it has to happen before your first visit to the sales office.

Call or text Brian: 561-201-4717 Book a new construction consultation

What official facts describe the new building versus what is there now?

Proposed: four stories, 26 units, about 98,000 square feet, FAR 2.52 and 2.5, density 29. Existing: a two-story office of about 11,000 square feet, FAR 0.29, built in 2002 per staff.

A downtown resale condominium already has a year built, a budget, and a price. This project, on November 12, has an approved Level 3 site plan in unfinalized minutes and no official offering price.

Can a buyer compare published prices?

Not from official sources.

A fair comparison would also need a clear tenure: the official file says “multi-family residential” and “market rate,” and it does not print a condominium-sale program. Until an official offering document exists, the honest comparison is about the published site-plan facts, 26 new units, 1,800 to 2,900 square feet, two bedrooms and three, set against whatever a finished downtown resale actually is, without a fake spread.

Is downtown Delray new construction a large set?

Downtown Delray’s new-construction set is small. A buyer who wants a finished, priced downtown residence is looking at a different product than a site-plan approval that still has no official from-price.

Brian Wilder's take

On November 12 I would tell a buyer that this is a new 26-unit building proposed on an office site, with no official price to set against a downtown resale. Pick a resale you like and we will compare the two on that home's own numbers.

Frequently asked questions

What does the city file say about the existing building?

The staff report describes an approximately 11,000-square-foot commercial office building constructed in 2002. The applicant narrative says it used to be home to a PNC bank.

Is the project already built?

No. The January 26, 2026 action is a Level 3 site-plan approval, in minutes not yet final.

Can a buyer compare published prices?

Not yet. The city file prints no from-price, so there is no number to set against a downtown resale.

How big are the planned homes?

The staff report gives 26 units, two and three bedrooms, from 1,800 to 2,900 square feet.

Selling your current home too?

Start with what your home is worth today: free home value.

Talk it through before you visit the sales office

The sales team at the model works for the builder. I work for you. Call or text me before your first visit so you are registered with your own agent. Wilder Real Estate Group, Keller Williams Realty.

Call or text Brian: 561-201-4717 Book a new construction consultation Get the buyer guide What is my home worth? New construction buyer guide

You'll also get our monthly Buyer Edition. Unsubscribe anytime.

More on this community

Own a home in Delray Beach near 109 SE 5th Avenue?

Book a seller call or use the valuation page.

Get the seller guide

Details as of November 12, 2026, from the builder's site: delraybeach.legistar.com.